Lane closed due to construction work on I-275 both ways from Exit 30 FL-686 Roosevelt Blvd to Exit 32 FL-687 4th St.
construction
Us-19both ways
Lane closed due to construction work on Us-19 both ways from 110th Ave to 126th Ave.
construction
FL-686 A Toll Roadboth ways
One lane closed due to construction work on FL-686 A Toll Road both ways near FL-688 Ulmerton Rd.
construction
US-19 SSouthbound
Exit ramp from US-19 Southbound to FL-690 Eastbound closed due to construction work. Detour in operation - Exit at Ulmerton Road, go south on Frontage Road, turn left onto eastbound 118th Avenue N, and use the left lane entrance ramp onto eastbound SR 690.
construction
US-19 SSouthbound
Exit ramp from US-19 Southbound to FL-690 Eastbound closed due to construction work. Detour in operation - Exit at Ulmerton Road, go south on Frontage Road, turn left onto eastbound 118th Avenue N, and use the left lane entrance ramp onto eastbound SR 690.
construction
FL-688both ways
Lane closed due to construction work on FL-688 Ulmerton Rd both ways at CR-611 49th St.
construction
CR-672both ways
Lane closed due to construction work on CR-672 Big Bend Rd both ways from Waterset Blvd to Simmons Loop.
construction
I-75Northbound
Lane closed due to construction work on I-75 Northbound at Exits 260A,260B FL-574 Dr Martin Luther King Jr Blvd.
construction
Us-19 Frontageboth ways
Lane closed on frontage road due to construction work on Us-19 Frontage both ways from 110th Ave to 126th Ave.
construction
FL-686both ways
Lane closed due to construction work on FL-686 Roosevelt Blvd both ways from CR-611 49th St to FL-688 Ulmerton Rd.
construction
FL-686Westbound
Entry ramp to FL-686 Westbound from 49th St Southbound lane closed due to construction work.
construction
Roosevelt BlvdWestbound
Exit ramp from Roosevelt Blvd Westbound to 49th St Northbound lane closed due to construction work.
construction
118th Aveboth ways
Lane closed due to construction work on 118th Ave both ways from Us-19 to 28th St.
construction
I-75both ways
Lane closed due to construction work on I-75 both ways from Exits 260A,260B FL-574 Dr Martin Luther King Jr Blvd to Exits 254,256,257 FL-60 Brandon Blvd.
construction
CR-611both ways
Lane closed due to construction work on CR-611 Bayside Brg both ways from 145th Ave to FL-60 Gulf To Bay Blvd.
construction
Wiggins Rdboth ways
Closed to high sided vehicles on Wiggins Rd both ways between Frontage Rd and Futch Rd.
construction
Keystone Blvdboth ways
Road closed due to construction work on Keystone Blvd both ways from Arnaz Cir to President Cir.
construction
Ridein RdNone
Shoulder closed due to construction work on Ridein Rd at Darlington Dr.
construction
Windsor WayNone
Shoulder closed due to construction work on Windsor Way between Ridein Rd and Tidewater Trl.
construction
Tidewater TrlNone
Shoulder closed due to construction work on Tidewater Trl at Darlington Dr.